How Mole Excavating Works in Guernsey laying pipes, cables & drains. Piling, under pinning

Guernsey Mole Excavating - Trenchless system

Mole Excavating specialises in Trenchless Technology, or installing services, either trenchlessly or by reducing the amount of trenching, time, cost and reinstatment normally associated with diggers.

Depending on soil conditions and what is needed to be laid the most suitable method can be determined after a brief site visit.

There are lots of different methods and technologies that Channel islanders are yet to see or hear about that are tried and tested and have been used worldwide in industry for decades. These technologies have been created to make laying pipes and cables, easier, quicker and less disruptive.

If you have any projects where any of these methods could be of use, just send an email, it doesnt hurt to ask.

You could save yourself, your customer or your organisation alot of time and money.

We also offer 100mm diameter driven cased piles. The load capability of these size piles are 60KN. This size of pile is for conservatories, garage bases and other lightly loaded structures where access is restricted. The pile casings range from 1.0m  to 2.0m sections. This enables the casings to be manually handled through doorways and into even into cellars.


Guernsey Mole Excavating  - Drill Head

 
 
For advice on your project call us now on 07781 113 562.